CPCCBC4003A Australian Standards & Regulations
You must provide sufficient evidence that meets the purpose of assessment as described. As a minimum, discussion must cover:
sourcing appropriate expert advice in contract preparation
scheduling progress payments
inclusion of specifications in the contract regarding termination of the contract
contract preparation – calculation of rise and fall
contract administration requirements
extension of time application
finalisation of contract documentation.
Assessment for this task will require demonstrating an understanding of all aspects by submitting a written report or folio, such a report my include written text,diagrams, photographs, etc.
Answer:
This tender is expected to last for duration of three years. The contract mainly scheduled to begin from 23rd November, 2018 and end on the 23rd November, 2021.
Payments of Works
The terms of the overall payments as far as the tender is concerned are not only important but also essential in the meantime. The payments mainly conducted in various sections in line with the works completed and approved by the engineer. The sheet used in the overall computation of the payment mainly illustrated and incorporated in the works as the illustrated below
Scopes of Works
Technical Drawings and Specifications
All the anticipated works must be performed and conducted as per the analogy as well as the overall description and specifications detailed in the design drawings. The contractor must all costs adhere to the overall specifications as well as the engineering designs as outlined in the technical drawings. Some of the key technical drawings as well as the overall evaluation and consideration for the particular works mainly outlined as indicated in the detailed drawings below
Australian Standards & Regulations
It is important to note all the installations as well as the purchasing of the materials for the purposes of the construction must at all cost conform to the set criteria as well as rules and regulations regarding the overall practices. The norms regarding the overall evaluations and the laws pertaining the understanding of the practices in this case mainly demarcated as indicated in the analysis below
Schedule
The schedules regarding the contract documents are not only important but also important at all the costs. The scheduling mainly performed and conducted as per the last of the building codes as well as the overall laws governing the contract in Australia. The analysis for the scheduling in line with this tender document mainly examined and evaluated as follows
DESIGN | |||
1 |
Design and Construct – Consultants Fees : | ||
· Architect, Engineers, Quantity Surveyor & Building Surveyor |
$ |
$ | |
2 |
Survey (site / location) |
$ |
$ |
3 |
Services (water, power, gas) connections / headworks | ||
· Western Power |
$ |
$ | |
· Water Authority |
$ |
$ | |
· Alinta Gas |
$ |
$ | |
SUBTOTAL |
$ |
$ | |
CONSTRUCTION | |||
1 |
Preliminaries |
$ |
$ |
2 |
Earthworks |
$ |
$ |
3 |
Site works |
$ |
$ |
4 |
Concrete Work |
$ |
$ |
5 |
Structural Steelwork |
$ |
$ |
6 |
Metalwork |
$ |
$ |
7 |
Brickwork & Blockwork |
$ |
$ |
8 |
Carpentry |
$ |
$ |
9 |
Second Fix Carpenter |
$ |
$ |
10 |
Roof Carpenter |
$ |
$ |
11 |
Joinery and Cabinetwork |
$ |
$ |
12 |
Hardware |
$ |
$ |
13 |
Roofer and Roof Plumber |
$ |
$ |
14 |
Drainage and Plumbing |
$ |
$ |
15 |
Electrical Services |
$ |
$ |
16 |
Mechanical Services |
$ |
$ |
17 |
Plasterwork & Suspended Ceilings |
$ |
$ |
18 |
Wall and Floor Tiling |
$ |
$ |
19 |
Resilient Finishes |
$ |
$ |
20 |
Glazier |
$ |
$ |
21 |
Paintwork |
$ |
$ |
22 |
Fencing |
$ |
$ |
23 |
Clean Up |
$ |
$ |
24 |
Stormwater Drainage |
$ |
$ |
Construction and Design
It is mandated for the contractor to conduct all the said works as per the instructions outlined in this document and not to bridge or omit any of the works. The governing norms regarding the overall analysis mainly discussed as well as appraised as indicated in the illustration below as per the Australia standards for the building and the related codes.
Figure Illustrating the Conditions Governing and Directing the Contractor
Other Property and Works
It mandatory for the contractor to ensure that all the works he or she performs as per the required set rules without bridging or destroying the existing properties in the long run. in essence, the contractor remains the sole liable person to all the destructions as well as the damages which he or she might cause to the existing property. The conditions governing the existing properties mainly demarcated and summarized as indicated below (Sanchez, Lehtiranta and Hampson 2015 p.1924).
Defect Liability
The contractor is required to provide and claim for all the payments regarding the additional costs incurred due to the works which do not conform to the ones precious described in the contract document. Furthermore, the contractor is required to replace as well as rework on all the un-conforming works without requesting for additional payment. The law forms the basis and ensures that quality works is often delivered as per the requirement at all costs. The illustrations in line with the norm mainly illustrated as per the diagram below (Oladotun and Edosa 2017).
Ending of the Contract
The norms regarding the termination of the contract as far as this tender is concerned are not only essential but equally important at all the costs. The close regarding the tender termination as far as the Australian rules and regulation is concerned mainly illustrated as indicated in the analysis below (Gurmu and Aibinu 2018 p.717).
Dispute Resolution
The dispute resolutions aspects in line with the tender documents as well as the overall analogy mainly appraised and discussed as per the analysis below. The resolution techniques mainly governed by the overall building and constructions laws in Australia State.
Illustrations on the Disputes and the Related Emerging Conflicts (Klee 2018)
Conclusion
In summary, this paper examined and explored all the aspects which one have to consider and incorporate in the contract document. Furthermore, the paper elobrated on the scopes of the works, the mode of payments for the works completed as well as the avenue for resolving the emerging disputes.
References
Klee, L., 2018. International construction contract law. John Wiley & Sons.
White, G., 2018, July. Design and Construct Contracts for Airport Asphalt Resurfacing. In Civil Infrastructures Confronting Severe Weathers and Climate Changes Conference (pp. 142-151). Springer, Cham.
Gurmu, A.T. and Aibinu, A.A., 2018. Survey of management practices enhancing labor productivity in multi-storey building construction projects. International Journal of Productivity and Performance Management, 67(4), pp.717-735.
Oladotun, A.J. and Edosa, O.M., 2017. The Need for Professionalism and Competencies in the Construction Industry. International Journal of Built Environment and Sustainability, 4(1).
Wong, P.S., Wang, Z.H. and Do, D., 2014. Use of the security of payment act in resolving disputes in Victoria, Australia. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 7(1), p.A4514001.
Sanchez, A.X., Lehtiranta, L.M. and Hampson, K.D., 2015. Use of contract models to improve environmental outcomes in transport infrastructure construction. Journal of Environmental Planning and Management, 58(11), pp.1923-1943.
Buy CPCCBC4003A Australian Standards & Regulations Answers Online
Talk to our expert to get the help with CPCCBC4003A Australian Standards & Regulations Answers to complete your assessment on time and boost your grades now
The main aim/motive of the management assignment help services is to get connect with a greater number of students, and effectively help, and support them in getting completing their assignments the students also get find this a wonderful opportunity where they could effectively learn more about their topics, as the experts also have the best team members with them in which all the members effectively support each other to get complete their diploma assignments. They complete the assessments of the students in an appropriate manner and deliver them back to the students before the due date of the assignment so that the students could timely submit this, and can score higher marks. The experts of the assignment help services at urgenthomework.com are so much skilled, capable, talented, and experienced in their field of programming homework help writing assignments, so, for this, they can effectively write the best economics assignment help services.