is mainly known as poor man’s timber, it is a perennial grass which can be found mostly in tropical areas and shockingly the strength of bamboo can outperform the steel in elasticity. Moreover, in Bangladesh bamboo is a majorly used material for construction. The world’s strongest plant is more sustainable in nature and can be used for construction which is environmentally friendly with minimum wastage. Bamboo is extremely good in its insulation properties and almost acts as a resistant material for various purposes.
Project Strategies for successful multidisciplinary and construction:
• To provide a more secure housing development in the midst of nature changes.
• Building durable long-lasting structures that will be strong under their living conditions
• To advance natural and individual cleanliness of the general population to ensure their wellbeing which incorporates better water supply and sanitation.
• Utilizing inexhaustible materials however much as could be expected
• To provide a more grounded structure to the houses which can withstand tremors,substantial breezes, tempests and ailments.
• Integrating sustainable strategies, for example, water harvesting, vegetation, and natural products.
• It is expected to outline the structure which gives poise, security of individuals and protection. Likewise, to give adaptability in outline which encourages the clients to include segments in the houses for better protection.
• Low building heights permits manual development which lessens energy use amid development
• To give utilization of sustainable power source by creating sunlight based boards on the rooftops and furthermore rain water collecting framework is introduced to reuse the water for cleaning reason and furthermore for little rural practices.
• Design expects to decrease heat loss in winter and increment air flow in summer to lessen energy use in operation
• To give a recreational focus to a superior correspondence among the general population as the correspondence in assuming a noteworthy part in a superior employment.
MULTIDISCIPLINARY TEAM WORK
The real advantage of the MDT (Multi-Disciplinary Team work) is for each circumstance or issue to be confronted as an alternate vantage points that are obtained to understand it. This MDT and better help from associates is often cited as important to the team members. Additionally, the staff working in groups conceivably builds the acknowledgment and adoptability of this kind of working. In numerous groups the fellow members may encounter a requesting nature in work however the job satisfaction and individual accomplishments will be high. New aptitudes can be obtained by the staff and every one of the individuals partake in basic leadership and this duty of taking choices. This composed collaboration may likewise convey difficulties to the group especially in group administration, debate determination, authority privacy and numerous others which are talked below.
INFLUENCING FACTORS
It is a crucial job to work in a multidisciplinary group for a few reasons. This happens essentially in light of the fact that the individuals from the group regularly report low in group identity and high in singular demonstrable skill.
In each group there is a multi-proficient nature as a result of various individuals having diverse jobs, it is prescribed to advance a mutual model of group administration for a superior cohesiveness in the group. To determine the extra pressures amongst MDT's and other administration structures there ought to be a general administration manager delegated for each group gatherings.
Answer:
This is a project proposal for the construction of the dwelling units, and the proposed project is meant to benefit and, accommodate the individual displaced due to the disaster catastrophic. Dwelling units in the camp will include and incorporate various centralized community services such as bathing and toilet facilities, cooking and dining hall, administrative services, and support centers.
Although the exact time for various victims will stay in the camp is not known, it is essential to consider and construct dwelling units which will efficiently accommodate the targeted population without piling pressure on the available amenities. Thus, this project is estimated to house about 200 people include the children and the aged persons. However, specific needy causes which may require particular attention also considered in the project scope and thus, ten dwelling units will be allocated the persons living with the disability. Working with a target of 200 people will ensure that there is the sustainable use of the available resources in the area and thus, no stress impacts on the available facilities. This project mainly utilizes bamboo materials in the construction work and will hasten the victims by creating for them a small community in which they can interact, get medical care as well as house them temporarily in the likely event that the catastrophic occur.
Projects and Specification Details
The specification and project details take into consideration all the aspects, needs and the requirements which the disaster victims need and form the essential part of their livelihood. All the reviews have to be outlined and described as these elements form part and parcel of the individuals. The victims may satisfy requirements mainly various and broadly classified health, emotional as well as social wellbeing (Johnson 2011). The dwelling units are thus arranged indecisive manner using the bamboo leaves and stalks and take into consideration all the overall welfare of the victim. Some of the parameters being considered in the process mainly include
- Accommodating Units
- Toilets and bathing units
- Administration
- Support services
- Cooking, Eatery and Dining Halls
- Schools
- Medical facilities
The outlined groups are thus discussed and appraised as follows
Accommodation Units
The project is expected to establish and build of maximum 50 accommodating units. Each has been estimated to carry the family members with a number ranging from at least 2-to-5 members. It, therefore, follows that all the family members are expected to occupy one unit that is the mother, father and the children available. Moreover, separate special units of about 20 units are also proposed, and this mainly aims at accommodating the person living with special need cases. Thus, the overall outlook regarding each housing unit primarily depicted as shown in the diagram below
Accommodating housing units for each family
Schools and Classrooms
Also, temporary education is an essential social aspect which the international refugee consultants have put into consideration. In essence, there is designing of the learning units and classrooms to ensure that there is a continuous learning exercise for the victims' on-going school persons. Thus, about five units have been proposed in terms of the classrooms for the on-going school persons. These units have been being decisively divided into classes as follows
- Classroom-1: (4- 6) years
- Classroom-2 (7-14) years
- Classroom-3 (15-18) years
- Classroom-4 (18 and above) years
- Classroom-5 (special needs unit)
Also, a common library with a carrying capacity of about 50 students will be included in the schooling and classroom aspect. Thus, the diagram below used in the process to show the outlook and overview of the class
Figure showing the outlook and classroom arrangement
The classes are expected to have a total carrying capacity of 50 students, and there are two units for each division including the persons living with a disability. This consideration is critical to ensure that learning process is taken care of but at the same time, there is no stress pressed on the existing and available amenities. Thus, this will hasten and enhance the sustainable use of the available resources in the camp as a whole.
Toilets and Bathing Units
The bathing units, as well as the toilets, are also essential and viable facilities which must be included in the design work as far as the project is concerned. In the designing of the elements, the fundamental assumption which preferably used is that that for every three housing units there is one bathing unit and a toilet. It is essential to ensure that the hygiene and health of the persons living in the camp are taken into consideration in the process (Georgescu and Pomonis 2011 p.21).
Administration
It is an essential unit which is also included in this designing aspect and the area allocated for this project is about 65m2 and this space. It is meant to accommodate various units such as the office of the director, Human resource managers offer, registry office, finance and security, technical and engineering office, the project coordinator office and the general inquiry office. Also, this is done to ensure that there are proper management and discharge of the duties in line with the chain of commands in the camp.
Cooking, Eatery and Dining Halls
Designated areas and places are also set aside for cooking eating as well as dining areas for various people living in this camp. Indeed, cooking areas for family units have established for every five housing units. This cooking unit is fully equipped and finished with a cooker and kitchen cabinets for storing the kitchen staff and the cooked food. They are fitted with locks and assigned to every family house for security purposes. On the other hand, there is a specially designed cooking area for the persons living with the disability. In fact, the camp director should employ various staffs to do the cooking on their behalf and serve them at the designated eateries in line with schedules programs in the camp (Peacock et al. 2018 p.220)
Support Centres
Also, the proposal includes the designing of the support centers which will offer various programs to the victims in the camp. The area for the support services mainly established to be 12m by 20m and thus, total to 240m2. This includes the space office and the hall for hosting various mentorship programs as well as counseling sessions for the multiple persons living in this camp. (Alarslan, Kemper and Altan 2011).
Project Construction and Management
The construction activities for this dwelling units and amenities are meant to take bamboo materials as the main raw ingredient. Moreover, in this design work, the project manager is mandated to conduct the overall coordination and supervision and is solely responsible for the completion of the activity within the specified time. Taking the role of the project manager in this task, I will ensure that all the aligned activities are adequately reviewed and the process conducted as the stipulation and within the outlined timeframe. I will also ensure that quality and set standards are adhered to in the process, and all the aspects regarding the same put into action.
In essence, planning and the overall management is a vital aspect and phase as far as the project work is concerned. Work schedule planning in the project helps in ensuring that all the outlined elements of the project meet the required standards and also assists in completing the work proposed with the set budget and stipulated time frame. Preferably, the correct and accurate organization of the staffs working in the project is as another critical aspect which must be considered in this project (Maly 2018 p.210).
As the project manager, I will organize the staffs using various departments such the logistics, supply, construction, and engineering works among others with the aim of ensuring that there is smooth running of all the outlined activities. Furthermore, I will set the various roles as well as the related responsibilities to be performed at the departmental levels. Notably, each department will have assigned coordinator and supervisor and all the staffs working under the umbrella will have to report and take instructions from them. Moreover, the below activities are some of the activities which I will perform as the project coordinator in line with this construction proposal for the area. They include:
- Lead as well as assisting in the management of the project team
- Assist in planning, managing and supervising the desirable regarding the proposed project
- Organize and ensure that the entire crew is working together
- Also monitoring all the project related activities, designing the progress evaluation as well as assisting in making all the decisions in line with the plan
- Also, recruiting and appointing various officials as well as the staffs who will assist in the overall implementation of the project
- Ensuring that the project is completed within the stipulated time and in line with the total budget estimate
Notably, there need to organize the overall work preferably to provide that project completed within the specified time and confines of the set budget. Thus, an organization structure is a fundamental aspect to be considered in this process. Moreover, there is a work breakthrough schedule (Anthony 2015).
Project Planning
The diagram below shows various analysis which will be used in exploring different avenues regarding the project planning. In essence, all the elements such as the risk analysis, the project cost, cash flow requirements, labor, materials as well as various project controls are incorporated in the study (Tafti, 2015 p.362).
Project Proposal Structure for the Organization
Also, the discharge of various in line with this project is mainly depicted at the different departmental levels as shown in the diagram below. In fact, it gives the overall steps and logistics regarding the chain of command which must be adhered to in line with the project (Tafti and Tomlinson 2015 p.165).
From the organizational structure, the following heads and roles are defined immensely
- The project manager is the boss the head of all the staffs working in this project
- The project coordinator is the individual in charge of supervising all the operations coming from different departments
- Other departments include in these structures are seniors assistants, workers, project coordinators, planning managers, quality surveyor as well safety engineers
Work Breakdown Structure
The overall wok breakthrough schedule to be used n this proposal mainly summarized as shown in the diagram below (Siami-Irdemoosa, Dindarloo, and Sharifzadeh 2015 p.85).
Schedule for the Project Proposal
The analyses on the various activities which will be conducted in this project proposal are summarized regarding the construction phase, starting time as well as finishing time. Furthermore, the total number of days which these activities need to take also outlined preferably in the analysis. Thus, the table below shows the report of the work to be completed concerning the time required (Fleming and Poole 2016).
Construction Phase |
Starting Time |
Finishing Time |
Rating |
Days |
The final estimate for the completion |
9/22/2018 |
10/2/2018 |
46% |
8d |
contract signed |
9/22/2018 |
9/22/2018 |
100% |
1d |
permission to commence work |
10/2/2018 |
10/2/2018 |
1d | |
Demo preparation |
10/3/2018 |
10/6/2018 |
4d | |
appliance , fixtures and salvage |
10/6/2018 |
10/7/2018 |
1d | |
safety fence delivery set up |
10/7/2018 |
10/8/2018 |
1d | |
electrical, cut power and install temp services |
10/8/2018 |
10/9/2018 |
1d | |
Excavation |
10/9/2018 |
10/11/2018 |
3d | |
foundation preparation |
10/13/2018 |
10/16/2018 |
3d | |
Backfilling |
10/16/2018 |
10/17/2018 |
1d | |
Concrete |
10/17/2018 |
10/28/2018 |
|
11d |
footings, walls, and pads |
10/28/2018 |
11/3/2018 |
6d | |
Pre backfill |
11/6/2018 |
11/12/2018 |
6d | |
Drainage |
11/12/2018 |
11/17/2018 |
5d | |
Waterproof |
11/17/2018 |
11/18/2018 |
1d | |
Roof |
11/18/2018 |
33d | ||
dry in roofing |
11/18/2018 |
11/21/2018 |
3d | |
upper roofing |
11/21/2018 |
11/22/2018 |
1d | |
Plumbing |
11/22/2018 |
11/23/2018 |
1d | |
Groundwork |
11/23/2018 |
|
|
33d |
Windows |
11/23/2018 |
12/2/2018 |
11d | |
order windows |
12/2/2018 |
12/6/2018 |
4d | |
install windows |
12/6/2018 |
12/24/2018 |
18d | |
HVAC |
12/27/2018 |
12/30/2018 |
3d | |
Ducting and Gas piping |
12/30/2018 |
1/2/2019 |
3d | |
Electrical |
|
|
|
16d |
electrical-rough in |
1/2/2019 |
1/8/2019 |
6d | |
plumbing -hang sinks |
1/8/2019 |
1/9/2019 |
1d | |
install under mount sinks |
1/9/2019 |
1/10/2019 |
1d | |
interior doors |
1/10/2019 |
1/11/2019 |
1d | |
delivery-hang |
1/11/2019 |
1/17/2019 |
6d | |
ship to pre-fin |
1/23/2019 |
1/29/2019 |
6d | |
Bamboo work |
|
|
|
12d |
bamboo work material delivery |
1/29/2019 |
2/3/2019 |
5d | |
bamboo installation and finishing |
2/3/2019 |
2/5/2019 |
2d | |
interior painting |
2/5/2019 |
2/8/2019 |
3d | |
interior preparation |
2/8/2019 |
2/11/2019 |
3d |
Equipment Used in the Bamboo Construction
Bamboo cutting tool
Bamboo Hacksaw
The device is overly used when there is a need for cross cutting of bamboo that has a diameter ranging from 2-3 cm. Bow saw consists of steel blade that has varying length. The module is usually connected to the Bow where it is securely tightened enabling it to be used for cutting Bamboo (Bintoro, Barus and Pamungkas 2017).southwest coast of Bangladesh. The budget is calculated as per 2014 unit per square metre rate
in Bangladesh. From the design, facilities including bathing and toilet areas, central kitchen,
gathering space, central eating are calculated and the costs are assumed per/m2 as 265 AUD
which is taken from a number of finished projects in Bangladesh over the years.
Table 4.1: Budget 1
The more point by point budget plan is provided below, which incorporates sub structure, super
structure, fittings are ascertained considering their standard units and an estimate is given. All
valuing in cost per/m2 has been alluded from made in Bangladesh items and from development
projects in Bangladesh changed over back to $AUD.
31
The calculations shown below are based on the following data:
Bed room 1: 4m x 3m
Bed room 2: 4m x 3m
Living area: 8m x 6m
Total area: 72 m
Windows:
The number of windows present in each unit are 4.The standard dimensions of windows used
for accommodations are 6mm×2100mm×600mm.
• in Living area: 1 windows of size 6mm×2100mm×1200mm
• Bed rooms : 2 windows of size 6mm×2100mm×600mm.
Doors:
• living room: 1 door
•Bed room 1: 1 door
•Bed room 2: 1 door
•Total no. of doors: 3
Sanitary:
• wash basin- 1.
• Shelves in accommodation: 2
Buy Srv799 The Construction Of The Assessment Answers Online
Talk to our expert to get the help with Srv799 The Construction Of The Assessment Answers to complete your assessment on time and boost your grades now
The main aim/motive of the management assignment help services is to get connect with a greater number of students, and effectively help, and support them in getting completing their assignments the students also get find this a wonderful opportunity where they could effectively learn more about their topics, as the experts also have the best team members with them in which all the members effectively support each other to get complete their diploma assignments. They complete the assessments of the students in an appropriate manner and deliver them back to the students before the due date of the assignment so that the students could timely submit this, and can score higher marks. The experts of the assignment help services at urgenthomework.com are so much skilled, capable, talented, and experienced in their field of programming homework help writing assignments, so, for this, they can effectively write the best economics assignment help services.