ENG3104 Engineering Simulations: Manufacturing Gear Simulation

Discrete Event Simulation

Create the model and optimise the revenue for the plant over ten days operation after an appropriate warm-up period.

Description

Gears are manufactured in a separate plant and arrive via a 20 m conveyor according to a distribution defined in the excel file supplied. This conveyor feeds an assembly area where gearboxes are assembled with two gears and two bearings (always available). The conveyor is of a belt type, the gears have a footprint of 80 by 80 by 100 mm and can be spaced on the conveyor 100 mm apart. The maximum capacity is 180 parts and speed 5 m/min.

The gearboxes are drawn from stock as castings and are loaded to a CNC workstation for additional machining and boring. An operator loads each casting to the workstation (0.5 – 1.0 minutes) and unloads them to a bin (maximum capacity 50) or a sample inspection station. Unloading takes 0.5 – 0.9 minutes and the machining cycle takes 2.3 minutes.

Every 20th gearbox machined is passed to an inspection station, the others to a buffer. The inspection operation cycle time is triangularly distributed with a minimum of 0.8 minutes, a maximum of 2.2 minutes with a mode of 1.1 minutes. This is carried out by the operator(s). Previous tests have shown that after 20 samples inspected there is a 78% chance that the critical dimensions (bores for bearings) are at the upper tolerance limit. When this occurs, the tools in the CNC workstation need to be replaced and the machine cleaned. This operation time is triangularly distributed with a minimum of 2.5, maximum 3.7 and mode of 3.2 minutes. The failed gearbox is scrapped.

Machined gearboxes are assembled with two gears and two bearings by an operator. This takes a mean of 3 minutes with a standard deviation of 0.7 minutes, but no less than 2.2 minutes and no greater than 5. The assemblies are put into a buffer for testing.

The test bench runs the gearboxes for 10 minutes and can initially take up to five at a time. An operator loads and unloads them to the test points. Loading and unloading both take from 0.2 to 0.4 minutes for each gearbox . There is a 93% chance of passing the gearbox for shipping; the failures are sent directly to a disassembly station where an operator will remove the gears and replace on the conveyor 5 m from its end. The gearbox castings and bearings are discarded. Disassembly takes a mean of 2.3 minutes with standard deviation 0.4, but no less than 1.7 and no greater than 3.5 minutes.

The plant is staffed by a number of operators (to be decided) who are trained in all activities.

Costs and Budget

You have purchased the CNC workstation for £72K, which needs to be repaid in three years. The plant operates on an eight-hour shift. Operators have 15 minute break in the morning and afternoon and one hour for lunch.

Additionally you have a budget of £15K to set up the remainder of the plant. This expenditure must be repaid within one year.

Costs

 

Assembly stations with appropriate tooling:

£1800

Bins for machined gearboxes:

£200

Test bench space per gearbox:

£2200

Fixed cost for hiring an operator (advertising, training etc.):

£1500

Operator hourly rate including on-costs:

£15.60


Task

Optimise the plant to achieve maximum revenue with budget. You may need to optimise the plant for the priorities of the machines first. The expected revenue for each completed and working gearbox is £80.

Investigate what effect a breakdown of each of the CNC workstation and the conveyor for 90 minutes has on the daily production rate.

Write a report describing your model and present results on a series of tests on the model. In your conclusions, present an evaluation of the model in the light of all assumptions made and what limitations they place on the model.


Buy ENG3104 Engineering Simulations: Manufacturing Gear Simulation Answers Online

Talk to our expert to get the help with ENG3104 Engineering Simulations: Manufacturing Gear Simulation Answers to complete your assessment on time and boost your grades now

The main aim/motive of the management assignment help services is to get connect with a greater number of students, and effectively help, and support them in getting completing their assignments the students also get find this a wonderful opportunity where they could effectively learn more about their topics, as the experts also have the best team members with them in which all the members effectively support each other to get complete their diploma assignments. They complete the assessments of the students in an appropriate manner and deliver them back to the students before the due date of the assignment so that the students could timely submit this, and can score higher marks. The experts of the assignment help services at urgenthomework.com are so much skilled, capable, talented, and experienced in their field of programming homework help writing assignments, so, for this, they can effectively write the best economics assignment help services.

Get Online Support for ENG3104 Engineering Simulations: Manufacturing Gear Simulation Assignment Help Online

); }
Copyright © 2009-2023 UrgentHomework.com, All right reserved.