Bbe203 - Managing Multiple Assessment Answer
BBE203: Managing Multiple Projects Construction Management Report Writing Assignment Help
Assignment Task:
Overview BBE203:
You and your business partner have just formed a new construction company, and have successfully tendered for your first project. a small industrial estate in the eastern suburbs. The project consists of 12 warehouses in a row, each of the same size being 30 meters deep by 15 meters wide. A common driveway runs down one side of the site to provide access. Each warehouse also has a small 2-level office space at the front. and 3 car parking spaces. The site for the construction of the warehouses has a substantial fall from front to back of approximately 6 meters. so bulk earthworks will be required to create the bench for the warehouses. On both sides of the si. there are existing precast panel warehouses. and there is no access available from the rear of the site. The only access to the site is at the front. from a busy four-lane main road.
The construction of the warehouses is precast concrete panel walls, structural steel frame. metal deck roofing. aluminum shopfronts, concrete floors, and external paving. The office component of each All has a unisex disabled toilet, a lunchroom. and 8Orn2 of air-conditioned open office space. Assume that the design work has been completed, and that a Building Permit is about to be issued for the project.
NOTE - If you make any other assumptions regarding the project, make sure these are clearly stated in your report.
project Requirements BBE203:
Your assessment task requires you to jointly investigate. plan and document (in a comprehensive and professional management report), a Construction Management Plan for the project which encompasses site layout planning. bulk earthworks strategy, construction sequencing. resource planning. a detailed construction program, cash flow forecasting, cost control strategies. and quality management procedures for the project.
Keep in mind that your multiple project consists of several buildings (or stages of the overall building). as well as the works around the buildings. The most important thing you need to decide is the sequence. and groupings you will adopt to get all 12 warehouses completed in a reasonable time. For example, will you build them one at a time. or in groups? What are the key factors that will influence this decision? Your bulk earthworks strategy may influence. your sequencing and programming for the overall project, or vice versa. What impact will OH&S issues have on your program? Clearly explain your thoughts and reasoning. Either way, it is suggested that you should first establish (and state) an estimate Of what you believe will be a suitable overall time frame, then work through (using basic planning principles) to establish the key tasks, their durations. labour resource requirements. trade overlaps, and the task dependencies to produce a detailed Construction Programme using MS Project. Compare your actual scheduled time against your initial estimation, and comment on any differences. Establish an estimated cost Of your project using broad estimating rates, and then use this and your construction program to determine a cash flow forecast, and to identify suitable cost control procedures for the project.
As this is your first project. the finished quality Of the works will be critical to its successful completion and your prospects Of future work, so you should establish
clear quality management plans and procedures for this specific project, which would be capable Of being adapted to all future projects. Present the final report in a concise manner. but in a way that is comprehensive enough to present to the local Council By-laws officers your client, to satisfy them that you know what you are doing. You should include a marked up plan Of your site showing the overall site. the buildings, and the factors listed above. The plan should be drawn using computer software Of your choice. In your discussion. explain how you will plan your labor and sub-contract resources to match your chosen construction sequencing, and how you will achieve a consistent quality across all Of the warehouses. In the Appendix Of your final report, include the Minutes Of at least two meetings Of your group where you have discussed your project in detail, including action items and time frames.
This BBE203: Construction Management Assignment has been solved by our Construction Management experts at Assignment Help Experts. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+ Students in Australia, UK & US by helping them to score HD in their academics. Our experts are well trained to follow all marking rubrics & referencing style.
Be it a used or new solution, the quality of the work submitted by our assignment experts remains unhampered. You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turnitin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.
Buy Bbe203 - Managing Multiple Assessment Answer Online
Talk to our expert to get the help with Bbe203 - Managing Multiple Assessment Answers to complete your assessment on time and boost your grades now
The main aim/motive of the management assignment help services is to get connect with a greater number of students, and effectively help, and support them in getting completing their assignments the students also get find this a wonderful opportunity where they could effectively learn more about their topics, as the experts also have the best team members with them in which all the members effectively support each other to get complete their diploma assignments. They complete the assessments of the students in an appropriate manner and deliver them back to the students before the due date of the assignment so that the students could timely submit this, and can score higher marks. The experts of the assignment help services at urgenthomework.com are so much skilled, capable, talented, and experienced in their field of programming homework help writing assignments, so, for this, they can effectively write the best economics assignment help services.
Get Online Support for Bbe203 - Managing Multiple Assessment Answer Assignment Help Online
Resources
- 24 x 7 Availability.
- Trained and Certified Experts.
- Deadline Guaranteed.
- Plagiarism Free.
- Privacy Guaranteed.
- Free download.
- Online help for all project.
- Homework Help Services